One Canary Wharf
Fit Out on behalf of Canary Wharf for Moodys Investments
Main Contract works included design stage development to fit out 8 floors of the Canary Wharf Tower replacing the existing toilets with a new contemporary design including the lift lobbies. The bespoke design and alterations to the existing systems included fire suppressant and detection systems, lighting, dry wall, new stone and bespoke joinery.
The updated new lift lobby including structural steel design to enable the installation of stone cladding, new raft ceilings, stainless steel lift liners and contemporary designed glass doors.
|
|
 |
|
|
|
|